About the Project

Completed dates:             October 2019 

Location:                          Bristol and Bath Science Park 

Client:                              South Gloucestershire City Council 

Specifics:

  • 16.4 kWp system
  • 100 m2 transparent BIPV
  • PS-CT series – 20% transparent
  • Up to 20 kWp (dependent on selected design)
  • Up to 6 tons of CO² saved per annum

Location:
Bristol and Bath Science Park
Power generated:
20KWh
Total m2:
80 m2.